It’s done!
After Installing the Window, Laying the Tile, Building the Cabinets, Painting the Room, The Door Installation Fiasco, Getting the Granite Installed, Installing the Radiant Floor Heat, Nailing in the Moulding, Tiling the Backsplash, Cleaning the Bathroom & Updating the fixtures, Installing a Bath Fan and air sealing the CrawlSpace.






